Issue link: https://construction.trimble.com/en/resources/i/1521374
3 Challenges We See in the Industry 10% of materials are wasted 30% of construction is rework 40% of buildings are under-utilized 40% of projects are over budget 90% of projects are late 40% of jobsite work is unproductive