Issue link: https://construction.trimble.com/en/resources/i/1520095
Estimating with spreadsheets • Slow and error-prone • Inconsistent job to job Paper based field tracking • Inefficient data collection • Lag time for reporting Struggle to link what was bid to what was expected in the field