B2W Track Feature Aligns Field Log and Accounting Values

Issue link: https://construction.trimble.com/en/resources/i/1520016

Contents of this Issue

Navigation

Page 3 of 5

Activity Summary Date of last True-up: 10/22/2020 Cost Type Labor Equipment Material Subcontracted Overall Total From Field Log 32,489.95 $ 20,593.24 $ 114,030.00 $ - $ 167,113.19 $ Total True-up Adjustment 2,876.14 $ - $ (800.00) $ 1,000.00 $ 3,076.14 $ Adjustment Percentage 9% 0% (1%) 100% 2%