B2W Schedule replaces the disconnected mix of spreadsheets, phone calls,
whiteboards and messages with a single solution for coordinated, collaborative
scheduling and dispatching of resources across job locations and over time.
Individuals manage scheduling based on their area of responsibility. Users
can view, enter and manage assignments and needs in real time. This puts
employees, equipment, materials and trucks in the right place at the right time,
reducing inefficiencies and downtime.
Enhance visibility with intuitive, customizable multi-day
interfaces for scheduling and dispatching
B2W Schedule provides a day-by-day view of assignments, needs and orders.
Managing crews, employees, equipment or trucks associated with these items
can be done with drag-and-drop simplicity, and assignments can be viewed or
planned as far into the past or future as needed. Users can apply multiple filters
and groupings to customize how they view the schedule according to specific
roles and requirements. An unlimited number of these user-defined views can be
stored, and security restrictions can be set up to determine which views can be
seen by which employees.
Streamline communication with system notifications
B2W Schedule information can be distributed to stakeholders through a
single click by utilizing user- generated notifications. Users can also configure
system-generated notifications for certain activities that happen while away
from the software, like a new need for a piece of equipment or order submitted
for a material on a job site.
B2W Schedule
RESOURCE SCHEDULING & DISPATCHING
OPTIMIZE RESOURCES TO
KEEP PROJECTS ON BUDGET
AND ON SCHEDULE
• Coordinated, collaborative
scheduling and dispatching
across workflows
• One, central system
• Real-time, enterprise-wide
visibility and access
• Mobile tablet and desktop
functionality