008-32 EL_11GH
A A - 2 A A - 3
K/D
8.02
SPM
436
KPM
0.54
TRACK 00:23:11
RATE 8MHZ
XII
While making these shifts is admittedly
easier said than done, the costs and
risks of doing nothing make it well
worth the eort. There's a saying that
the way to eat an elephant is one
bite at a time. The same is true of
implementing Connected Construction
at your company.
By taking the steps needed to get your
transformation o to a good start,
you'll reap the benets in the form of
improved productivity, quality, safety,
transparency, and sustainability.
SUSTAINABILITY
SAFETY
QUALITY
EFFICIENCY
PROFITABILITY
PRODUCTIVITY