CHALLENGE:
As a large, global construction
company, VolkerWessels was
challenged to eciently share
high-quality, timely project information
among key stakeholders. The volume of
data scattered across the company and
their projects often slowed productivity
and increased (failure) costs, making it
dicult to rely on information to make
informed decisions.
SOLUTION:
Trimble Connect, Trimble ProjectSight,
Trimble Vico Oce and more.
RESULTS:
• Building a data-centric approach to BIM: Bringing together unstructured
data into a common data environment is adding order, richness and value to
project data while improving information sharing.
• Unlocking the value of the constructible process: A common data
environment enabled by Trimble technology is the key to unlocking the real
value of building information and workows based on constructible data.
• Streamlining and enhancing collaboration: More ecient sharing of 3D
models, data and project information between key project stakeholders
facilitates enhanced collaboration.
Driving greater value: Using constructible models to guide decision making
enhances the accuracy and eciency of the design, build and operate
phases of construction
Case study
READ THE FULL STORY
Volkerwessels drives technology
innovation and transformation
across the construction lifecycle.
https://connect.trimble.com/use-case/volkerwessels-use-case