Trimble Construction

The MEP Contractor's Guide to Constructability

Issue link: https://construction.trimble.com/en/resources/i/1298020

Contents of this Issue

Navigation

Page 7 of 9

The MEP Contractor's Guide to Constructibility 8 MEP detailers are responsible for zooming into the initial design or model and determining how to apply practical engineering and construction knowledge and experience to designing the structure's mechanical, electrical, and plumbing systems. This important work directly impacts both the fabrication and installation phases by providing the details needed to quickly and efficiently produce and install every pipe, outlet, and duct needed throughout the building. But, it can also bring to light issues in the initial design or estimate, sometimes requiring further collaboration with the architect, structural engineers, and even the owner. By resolving these issues virtually using collaborative 3D models, the detailer can save a tremendous amount of time and money on both ends of the project and help produce a better product overall. Coordinate the detailing Pre-verified measurements for every component Up-to-date manufacturer specifications A complete "big picture" understanding of how each component fits into the completed structure Detailed fabrication instructions Optimize the fabrication process By passing a content-enabled constructible model to the fabrication shop, detailers and project managers offer shop managers all the benefits of that data:

Articles in this issue

Links on this page

view archives of Trimble Construction - The MEP Contractor's Guide to Constructability