Customer Stories

A View To A Fill: Trimble GPS Technology Smooths Grading Jobs

When Nick Savko & Sons, Inc. was founded more than 60 years ago, Global Positioning System (GPS) technology was a thing of the distant future. Today, the Columbus, Ohio based site development firm considers it a necessity. From the owners to the estimators to the project supervisors, those who work at Nick Savko & Sons, Inc.
View Story

Trimble DPS900 brings accuracy and improved safety to South African mine

Situated just outside the mining community of Witbank, Mpumalanga, South Africa, Anglo American’s Landau Colliery covers 8,200 hectares, producing between four and five million metric tonnes of high-grade export coal annually, and about one million tonnes for local consumption within the power sector.
View Story

Advanced Telematics

As featured in Equipment World magazine, August 2010
View Story

Small Contractor Adopts Technology

There is a point - a point where the realization hits a construction contractor and a decision is made. The decision could be to invest in more heavy equipment. It could be to add a new service. It could be to expand geographically into new markets. Or, as in the case of S.
View Story

Trimble Helps Contractor Save Time and Money on Kunming Airport Project

Originally built in 1922, Kunming WUJIABA International Airport is an important regional hub in southwest China. In 2010, the airport handled more than 15 million passengers, far beyond the intended capacity of the facility. This volume of passenger traffic made Kunming Airport the seventh busiest airport in mainland China.
View Story

There's No Stopping Trimble Machine Control

As seen in Construction Equipment Distribution, August 2010              
View Story

Site Prep Contractor Adopts Trimble Grade Control

In life, taking that first step in a new direction is often the hardest. To do it right, requires knowledge and guts. This truism applies to personal and business life.
View Story

Trimble Alignment Planning: Bauhina Mine Regional Rail Project

MIM Holdings (now Xstrata PLC) commissioned the Trimble Alignment Planning system for application by their appointed consultant, Parsons Brinkerhoff, on a 92km section of the Bauhinia Regional Mine Rail Project.The major objective of MIM was to find the most cost effective rail alignment, which ensured the minimum operating costs over the 20 year mine life cycle, whilst limiting the community,
View Story

Trimble 3D Paving Control System Delivers Extreme Accuracy

Die komplette 18,1 Kilometer lange Strecke mit 25 Brückenbauwerken und fünf Anschlussstellen bei Gesamtkosten von fast 70 Millionen Euro soll im Jahr 2013/2014 fertig gestellt sein. Dann steht mit der B56n eine sehr leistungsfähige Verbindung zwischen den Industriezentren an Rhein und Maas und dem Ruhrgebiet sowie den Seehäfen Antwerpen und Rotterdam zur Verfügung.  
View Story

France-based PERRIER TP Uses Trimble 3D Grade Control for a Competitive Edge

The Satolas Site Project The SATOLAS site, where PERRIER TP is carrying out the excavation work for a new landfill, is a new forum for the group to display its capabilities.
View Story